Mr Correa in LONDON
• Forensic engineering and expert witness services • Delay and quantum analysis • Construction disputes • Complex insurance claims
Mr Hampshire in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence Other experts in the company: Mr Richard Brasnett Chartered Building Surveyor & Mr Aidan Stephenson Chartered Quantity Surveyor
Mr Thody in LONDON
Chartered Building Surveyor, RICS Adjudicator, RICS and CEDR Accredited Mediator • Qualified Expert with specialisms in the following: • Building defects and pathology - investigation of structural failures, water ingress, damp and mould, workmanship quality, and compliance with regulations; assessment of causation and quantum of remedial works. • Contractual disputes - interpretation of JCT, NEC and PPC2000 contracts; breach and termination matters; assessment of work completed; quality of construction work completed; delay analysis, disruption and variation claims; ...
Mr Jackson in LEEDS
I am a Chartered Quantity Surveyor with significant experience in the construction and engineering industry. My expertise covers professional negligence, contractual disputes, contract administration issues and costs disputes. I am the holder of an expert witness training certificate issued by the Royal Institution of Chartered Surveyors (RICS).
Mr Klein in WARRINGTON
Building & construction problems • Negligence (construction) • Professional negligence (architecture/construction) • Home improvement disputes • Contractual disputes (construction) • Contractor & subcontractor disputes • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming & time disputes (construction) • Property insurance & claims investigation • Claims investigation (property insurance) • Public liability insurance (construction)...
Mr Belk in SIDCUP
Disrepair • Construction defects • Design and specification • Construction procurement and tendering • Programme management • Contract administration • Housing • Educational buildings
Mr Emin in YORK
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or single joint expert witness on construction disputes of all sizes and at al...
Mr Knott in LONDON
Summary of Matters in which I am competent to accept instructions (Quantum and Quantum Expert Work) I am a Chartered Quantity Surveyor (MRICS) and Member of the Chartered Institute of Arbitrators (MCIArb) with approximately 20 years’ experience in the construction industry . My professional practice focuses on the commercial and financial management of construction projects and the preparation of quantum analyses, quantum reports and independent expert quantum evidence in construction and engineering disputes. I special...
Mr Hearne in NEATH
Quantum • Construction, civil engineering, railway, highway, infrastructure, building & refurbishment • Loss of profit in construction contracts • Breach of construction contracts • Extension of time analysis • Loss and expense claims • Flood damage • Fire/smoke damage • Storm damage • Professional fees Construction/quantity surveying costs Control • Planning • Forecasting • Estimating • Interim valuations • Delay cost calcula...
Mr Klinefelter in DISS
Construction/civil engineering - delays, including the following disciplines: • Highways • Structures • Marine • Building • M&E • Facades • Infrastructure • Airports • Rail • Civil engineering • Construction • High-end residential
Mr Emin in LONDON
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or single joint expert witness on construction disputes of all sizes and at al...
Mr Hooper in NEWBURY
I work as an expert witness, neutral advisor and expert determiner in IT and outsource services: • Fitness for purpose in application, code review and forensic analysis, infrastructure, project and service management. I have particular experience in large-scale delivery (up to £250m a year), transformation, Agile methods and professional competence • IT project delay cause and quantification • Intellectual property review of algorithms, similarity of code, delivery methods, development effort, confidentiality, licensing, database rights • IT and outsourc...
Mr Kelly in BALLYNAHINCH
My fields of expertise are quantum, dispute management and adjudication. I am also trained as an Arbitrator, Adjudicator, Conciliator and Mediator in disputes for construction, property, commercial agreements, infrastructure, oil and gas, commodities, etc.
Mr Corrigan in LONDON
Hugh has over 35 years’ experience in civil, structural and multidisciplinary design, engineering and management of major infrastructure and building projects, including design-build, EPC, PFI and BOT projects. He has been responsible for the design and management of many unique building and infrastructure projects, including complex above and below ground structures in difficult ground conditions. Hugh has extensive expertise in civil, structural, geotechnical, transportation, utility, water, wastewater design and marine engineering. He has extensive experience in forensic engineering...
Mr Holden-Smith in CLITHEROE
Chartered Quantity Surveyor | Chartered Construction Manager | Forensic Delay Analyst | Registered Adjudicator | Registered Arbitrator Forensic delay analysis in construction • Quantum of construction claims including, but not limited to, commercial construction works, loss and expense claims and damages
Mr Hannent in DEAL
Building control and regulations • Construction contract disputes • Negligent construction and design • Housing disrepair • Building defects and pathology • Surveyor negligence • Valuation of property, including family, proceeds of crime, land with development potential, diminution, etc. • Party wall and boundary matters Also consulting at: 140 Ewell Road, Surbiton ,KT6 6HE.
Mr Murphy in READING
Forensic delay and time element analysis with over 34 years' experience across conventional and renewable energy, data centres, infrastructure and industrial construction • Critical path and programme evaluation, extension of time assessment, delay in start-up and business interruption claims, reinstatement scheduling, and insurer advisory services • Extensive EPC experience under FIDIC, NEC and JCT contracts • Holds international appointments across the UK, Europe, MENA, the US and Asia
Mr Sharp in SHEFFIELD
Quantity surveying • Quantum • Construction contracts • Quantification and valuation of work carried out • Quantification of damages, loss and/or expenses incurred • Liability in professional negligence matters • Liability in professional indemnity matters • Programming issues (e.g. delay, extension of time, acceleration and disruption) • Due diligence forensic examination of companies and projects
Mr Daunt in NEWCASTLE UPON TYNE
I am a Chartered Quantity Surveyor with 30 years' construction experience in commercial, education, healthcare, justice, industrial, mixed-use, retail, infrastructure and residential buildings. I have significant hands-on experience in numerous forms of contract, including JCT, NEC, PFI, IChemE and bespoke main and subcontract forms. Acted as Expert Advisor in a £150M High Court proceedings brought under the Building Safety Act 2022 in a high-rise mixed residential development in London (HT-2020-000467 and HT-2022-000024). Testified expert in the High Court on a £1.2M dispute on t...