Mr Hampshire in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence Other experts in the company: Mr Richard Brasnett Chartered Building Surveyor & Mr Aidan Stephenson Chartered Quantity Surveyor
Mr Sharp in SHEFFIELD
Quantity surveying • Quantum • Construction contracts • Quantification and valuation of work carried out • Quantification of damages, loss and/or expenses incurred • Liability in professional negligence matters • Liability in professional indemnity matters • Programming issues (e.g. delay, extension of time, acceleration and disruption) • Due diligence forensic examination of companies and projects
Mr Laslett in HYTHE
Project planning & scheduling • Critical path analysis (CPA) • Delay & extension of time (EOT) • Project management • Project controls • Project engineering • Technical • Capital projects • All above in the following sectors: Offshore oil & gas, FPSOs, decommissioning, petrochemicals, pipelines, shipbuilding, oil rigs, power generation, renewables (including offshore wind farms, solar, wave/tidal), infrastructure, capital projects
Mr Corrigan in LONDON
Hugh has over 35 years’ experience in civil, structural and multidisciplinary design, engineering and management of major infrastructure and building projects, including design-build, PFI and BOT projects. He has been responsible for the design and management of many unique building and infrastructure projects, including complex above and below ground structures in difficult ground conditions. Hugh has extensive expertise in civil, structural, geotechnical, transportation, utility, water, wastewater design...
Mr Correa in ESHER
• Forensic engineering and expert witness services • Delay and quantum analysis • Construction disputes • Complex insurance claims
Mr Emin in YORK
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or...
Mr Daunt in NEWCASTLE UPON TYNE
RICS Registered Expert Witness I am a Chartered Quantity Surveyor with 30 years' construction experience in commercial, education, healthcare, justice, industrial, mixed-use, retail, infrastructure and residential buildings. I have significant hands-on experience in numerous forms of contract, including JCT, NEC, PFI, IChemE and bespoke main and subcontract forms. Quantum • Valuation of work carried out and sums withheld • Application of Construction Act • Payment notices • Payless notices • Notified sums • Extension...
Mr Hearne in NEATH
Quantum • Construction, civil engineering, railway, highway, infrastructure, building & refurbishment • Loss of profit in construction contracts • Breach of construction contracts • Extension of time analysis • Loss and expense claims • Flood damage • Fire/smoke damage • Storm damage • Professional fees Construction/quantity surveying costs Control • Planning • Forecasting • Estimating • Interim valuations • Delay cost calculations • Cashflow • Valuation of sums withheld Construction contracts Subcontracts • Procurement, selection...
Mr Jackson in LEEDS
I am a Chartered Quantity Surveyor with significant experience in the construction and engineering industry. My expertise covers professional negligence, contractual disputes, contract administration issues and costs disputes. I am the holder of an expert witness training certificate issued by the Royal Institution of Chartered Surveyors (RICS).
Mr Belk in SIDCUP
Disrepair • Construction defects • Design and specification • Construction procurement and tendering • Programme management • Contract administration • Housing • Educational buildings
Mr Renwick in WHALLEY
Construction final account disputes • Construction variation accounts • Professional negligence (quantity surveyor) • Bank monitoring • JCT, FIDIC, NEC and other forms of contract • Quantum
Mr Farquharson in WOKING
I am Director of MaaStran Ltd and Smartran Consulting. I have been responsible for investigating and resolving many contractual issues and disputes. I have most recently appeared as Expert Witness in a dispute taken to ICC Tribunal by a public authority against a technology services supplier. I led the preparation of two reports, guidance to the client, presented to Tribunal, underwent cross-examination and participated in an expert witness conference. Our client won this case and was awarded a substantial...
Mr Emin in LONDON
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or...
Mr Hooper in NEWBURY
I work as an expert witness, neutral advisor and expert determiner in IT and outsource services: • Fitness for purpose in application, code review and forensic analysis, infrastructure, project and service management. I have particular experience in large-scale delivery (up to £250m a year), transformation, Agile methods and professional competence • IT project delay cause and quantification • Intellectual property review of algorithms, similarity of code, delivery methods, development effort, confidentiality,...
Mr Klein in WARRINGTON
Building & construction problems • Negligence (construction) • Professional negligence (architecture/construction) • Home improvement disputes • Contractual disputes (construction) • Contractor & subcontractor disputes • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming & time disputes (construction) • Property insurance & claims investigation • Claims investigation (property insurance) • Public liability insurance (construction) • Contractor insurance • Professional...