Mr Sullivan in LONDON
Building & construction problems Negligence (construction) • Professional negligence (architecture & construction) • Home improvement disputes • Cladding disputes • Contractual disputes (construction) • Contractor/subcontractor disputes (construction) • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming & time disputes (construction) • Claims investigation (property insurance) • Professional indemnity (construction)
Mr Barber in MARPLE
Experienced in sewerage and land drainage matters to include: • drainage investigations • drainage design • preparation of drainage contracts • supervision and management of drainage contracts • management of consulting engineers • hydraulic modelling and masterplanning of sewerage networks. Experienced in allegations of professional negligence against consulting engineers Experienced in allegations of bad workmanship against contractors
Mr Emin in LONDON
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or single joint expert witness on construction disputes of all sizes and at al...
Mr Brasnett in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence • Building surveying • Residential valuations
Mr Duckham in LONDON
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Klinefelter in DISS
Construction/civil engineering - delays, including the following disciplines: • Highways • Structures • Marine • Building • M&E • Facades • Infrastructure • Airports • Rail • Civil engineering • Construction • High-end residential
Mr Hampshire in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence Other experts in the company: Mr Richard Brasnett Chartered Building Surveyor & Mr Aidan Stephenson Chartered Quantity Surveyor
Mr Jackson in LEEDS
I am a Chartered Quantity Surveyor with significant experience in the construction and engineering industry. My expertise covers professional negligence, contractual disputes, contract administration issues and costs disputes. I am the holder of an expert witness training certificate issued by the Royal Institution of Chartered Surveyors (RICS).
Mr Emin in YORK
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or single joint expert witness on construction disputes of all sizes and at al...
Mr Todd in HAYWARDS HEATH
A Chartered Building Services Engineer and Designer with over 30 years' experience. Taking instruction as an expert witness since 2005. As the Managing Director of BSE3D Consulting Engineers, Mr Todd has worked on many large and small award-winning and complex buildings both in the UK and internationally. Supporting clients to look for alternative practical and economic solutions to any systems that require remediation. He can be most effective if he is instructed before disproportionate remedial works have been carried out....
Mr Byng in COVENTRY
Chartered Quantity Surveyor acting on building, civil engineering and railway construction contracts throughout the United Kingdom, the European Union, the Middle East, Asia and Africa, Australasia and China • Over 30 years’ experience of procuring and managing building and civil engineering contracts to completion, creating projects for the design, construction and delivery of major engineering infrastructure projects, procured traditionally and by PFI or PPP methods, including expert determination of disputes arising from PFI contracts • Negotiating mergers of consultancy fi...
Mr Duckham in YORK
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Rudd in KINGSTON UPON THAMES
Kevin Rudd is a Fellow of the Institute of Mechanical Engineers in the UK & is the only member in the British Cement Industry who has achieved this status • With ~20 years' experience, including: • Expert witness • Due diligence • Cement plant feasibility studies • Green or brown field cement plant project management • Technical & financial evaluation of equipment • Factory acceptance testing • Cement plant operations • Cement industry insurance claim investigations • Troubleshooting for cement kilns & mills
Mr Thody in LONDON
Chartered Building Surveyor, RICS Adjudicator, RICS and CEDR Accredited Mediator • Qualified Expert with specialisms in the following: • Building defects and pathology - investigation of structural failures, water ingress, damp and mould, workmanship quality, and compliance with regulations; assessment of causation and quantum of remedial works. • Contractual disputes - interpretation of JCT, NEC and PPC2000 contracts; breach and termination matters; assessment of work completed; quality of construction work completed; delay analysis, disruption and variation claims; ...
Mr Murphy in READING
Forensic delay and time element analysis with over 34 years' experience across conventional and renewable energy, data centres, infrastructure and industrial construction • Critical path and programme evaluation, extension of time assessment, delay in start-up and business interruption claims, reinstatement scheduling, and insurer advisory services • Extensive EPC experience under FIDIC, NEC and JCT contracts • Holds international appointments across the UK, Europe, MENA, the US and Asia
Mr Corrigan in LONDON
Hugh has over 35 years’ experience in civil, structural and multidisciplinary design, engineering and management of major infrastructure and building projects, including design-build, EPC, PFI and BOT projects. He has been responsible for the design and management of many unique building and infrastructure projects, including complex above and below ground structures in difficult ground conditions. Hugh has extensive expertise in civil, structural, geotechnical, transportation, utility, water, wastewater design and marine engineering. He has extensive experience in forensic engineering...
Mr Daunt in NEWCASTLE UPON TYNE
I am a Chartered Quantity Surveyor with 30 years' construction experience in commercial, education, healthcare, justice, industrial, mixed-use, retail, infrastructure and residential buildings. I have significant hands-on experience in numerous forms of contract, including JCT, NEC, PFI, IChemE and bespoke main and subcontract forms. Acted as Expert Advisor in a £150M High Court proceedings brought under the Building Safety Act 2022 in a high-rise mixed residential development in London (HT-2020-000467 and HT-2022-000024). Testified expert in the High Court on a £1.2M dispute on t...
Mr Kelly in BALLYNAHINCH
My fields of expertise are quantum, dispute management and adjudication. I am also trained as an Arbitrator, Adjudicator, Conciliator and Mediator in disputes for construction, property, commercial agreements, infrastructure, oil and gas, commodities, etc.
Mr Mathieson in POOLE
Building contract disputes • Disrepair claims • Defective design & workmanship negligence claims • Building pathology • Building conversion & restoration • Party Wall, etc., Act Mr Mathieson is a Member of the Royal Institution of Chartered Surveyors, Managing Director of Ellis Belk Associates Limited and a practising Chartered Building Surveyor with many years' experience investigating building defects of both design and workmanship. In addition to his expert witness workload, Mr Mathieson has been involved with Channel 4 and the BBC on such ...
Miss Stylianide in LONDON
Technical specifications • Construction/architecture-related matters • Building information modelling (BIM) • Contract administration/risk and liabilities/interpretation of contract terms and obligations • Defects in construction materials or workmanship • Compliance with building codes and regulations • Breach of contract and professional negligence • Standard of care in construction • Design deficiencies • Project delays
Mr Barrows in ST HELIER
Expert witness and troubleshooting of the following electrical building services: • Extra low voltage • Safety extra low voltage • Low voltage • Standby generation • Uninterruptible power supplies • Critical and essential electrical systems • Earthing • Lightning protection • Interior lighting • Exterior lighting • Emergency lighting • Fire alarm systems • Due diligence surveys and investigation • Mediation • Scott schedules • Contractual disputes • Testing and commissioning p...
Mr Sharp in SHEFFIELD
Quantity surveying • Quantum • Construction contracts • Quantification and valuation of work carried out • Quantification of damages, loss and/or expenses incurred • Liability in professional negligence matters • Liability in professional indemnity matters • Programming issues (e.g. delay, extension of time, acceleration and disruption) • Due diligence forensic examination of companies and projects
Mr Pereira in RICHMOND
Subsidence, heave, settlement and ground movement • Damage from back extensions and loft conversions • New house and extension foundation design • Foundation and pile design (bored piles, CFA piles, mini piles, secant and contiguous piled walls) • Retaining walls and failed retaining structures • Basements and basement impact assessment near neighbouring properties • Boundary and level difference disputes (banks, embankments, cuttings) • Ground investigation and site investigation adequacy • Geotechnical analysis and design • Slope stabilit...