Mr Duckham in BRISTOL
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Frias-Robles in BOURNEMOUTH
Building contract disputes: financial & contractual analysis • Dilapidations claims • Dampness & disrepair claims • Party Wall Act • Defective or incomplete building works • Building defects: commercial & residential • Boundary disputes • Access to neighbouring land • Insolvency claims in construction contracts • Mr Frias-Robles is a Member of the Royal Institution of Chartered Surveyors (FRICS) • Party wall expert & Chairman of the Pyramus and Thisbe Club (Wessex Branch)
Mr Carpenter in CHICHESTER
Highways • Bridges • Earthworks • Foundations • Drainage • Flood defences • Reinforced concrete • Multi-storey car parks • Retaining structures • Housing • Commercial developments • Sustainable drainage works • Contract administration
Mr Barber in MARPLE
Experienced in sewerage and land drainage matters to include: • drainage investigations • drainage design • preparation of drainage contracts • supervision and management of drainage contracts • management of consulting engineers • hydraulic modelling and masterplanning of sewerage networks. Experienced in allegations of professional negligence against consulting engineers Experienced in allegations of bad workmanship against contractors
Mr Hannent in DEAL
Building control and regulations • Construction contract disputes • Negligent construction and design • Housing disrepair • Building defects and pathology • Surveyor negligence • Valuation of property, including family, proceeds of crime, land with development potential, diminution, etc. • Party wall and boundary matters Also consulting at: 140 Ewell Road, Surbiton ,KT6 6HE.
Mr Jackson in LEEDS
I am a Chartered Quantity Surveyor with significant experience in the construction and engineering industry. My expertise covers professional negligence, contractual disputes, contract administration issues and costs disputes. I am the holder of an expert witness training certificate issued by the Royal Institution of Chartered Surveyors (RICS).
Mr Sullivan in LONDON
Building & construction problems Negligence (construction) • Professional negligence (architecture & construction) • Home improvement disputes • Cladding disputes • Contractual disputes (construction) • Contractor/subcontractor disputes (construction) • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming & time disputes (construction) • Claims investigation (property insurance) • Professional indemnity (construction) Surveying & valuation Surveyor negligence Construction...
Mr Hampshire in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence Other experts in the company: Mr Richard Brasnett Chartered Building Surveyor & Mr Aidan Stephenson Chartered Quantity Surveyor
Mr Gallucci in LONDON
Quantity surveying matters • Building surveying matters • Delay matters • Specialising in mechanical and electrical services
Mr Duckham in YORK
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Munro in ELY
Highway design • Highway construction • Highway maintenance • Highway construction contracts
Mr Emin in LONDON
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or...
Mr Thody in LONDON
Chartered Building Surveyor and Chartered Procurement Consultant, with specialisms in the following: • Building defects analysis • Building pathology • Building maintenance • Construction projects • Construction design and management • Contractual matters (under JCT/NEC/ACA forms of contract) on all types of contract, including new build, maintenance and refurbishment • Public procurement • Public sector projects • Neighbourly disputes
Mr Klinefelter in DISS
Construction/civil engineering - delays, including the following disciplines: • Highways • Structures • Marine • Building • M&E • Facades • Infrastructure • Airports • Rail • Civil engineering • Construction • High-end residential
Mr Clark in LEEDS
Academy of Experts & Registered Expert Witness Consulting Engineer with more than 50 years' experience in the UK, Middle East, Far East and SE Asia. Design of numerous low- and high-rise commercial, industrial and public buildings and structures, as well as basements, foundations and retaining walls involving: • masonry • concrete • steel • timber. Investigation of defective: • design • materials • construction • fabrication • manufacturing. Investigation of: • failure in duty of care in civil, structural and environmental...
Mr Todd in HAYWARDS HEATH
A Chartered Building Services Engineer and Designer with over 25 years' experience. Taking instruction as an expert witness since 2005. As the Managing Director of BSE3D Consulting Engineers, Mr Todd has worked on many large and small award-winning and complex buildings both in the UK and internationally. Supporting clients to look for alternative practical and economic solutions to any systems that require remediation. He can be most effective if he is instructed before disproportionate remedial works have...
Mr Byng in COVENTRY
Chartered Quantity Surveyor acting on building, civil engineering and railway construction contracts throughout the United Kingdom, the European Union, Australasia and China • Over 30 years’ experience of procuring and managing building and civil engineering contracts to completion, creating projects for the design, construction and delivery of major engineering infrastructure projects, procured traditionally and by PFI or PPP methods, including expert determination of disputes arising from PFI contracts • Negotiating...
Mr Emin in YORK
I am a chartered quantity surveyor with over 18 years’ construction experience in residential, Ministry of Defence, education, healthcare, industrial, mixed-use, infrastructure and commercial building. I have significant hands-on experience in quantity surveying and contract administration under numerous suites/forms of contract including JCT, PPC, NEC, EPIC/EPC and bespoke forms, as well as experience of most methods of procurement. I am a Partner at Quantum Experts and able to act as a party-appointed or...
Mr Norris in LONDON
Government-funded projects • Managing a small team of surveyors • The Leadenhall Building, London - engaged to produce a full bill of quantities for several fit-out packages on a new 55-storey office development in central London. • 1 Threadneedle Street, London - engaged to produce bills of quantities for main structural elements of a major landmark office refurbishment in the City of London. • St James’ Square, London - engaged to produce bills of quantities for major structural elements and demolition of...
Miss Stylianide in LONDON
Technical specifications • Construction/architecture-related matters • Building information modelling (BIM) • Contract administration/risk and liabilities/interpretation of contract terms and obligations • Defects in construction materials or workmanship • Compliance with building codes and regulations • Breach of contract and professional negligence • Standard of care in construction • Design deficiencies • Project delays
Mr Duckham in LONDON
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Daunt in NEWCASTLE UPON TYNE
RICS Registered Expert Witness I am a Chartered Quantity Surveyor with 30 years' construction experience in commercial, education, healthcare, justice, industrial, mixed-use, retail, infrastructure and residential buildings. I have significant hands-on experience in numerous forms of contract, including JCT, NEC, PFI, IChemE and bespoke main and subcontract forms. Acted as Expert Advisor in a £150M High Court proceeding brought under the Building Safety Act 2022 in a high-rise mixed residential development...
Mr Swayne in PRESTWOOD
I have extensive experience in the design, specification, supervision and/or project management of mechanical and electrical engineering services installations, on a wide variety of commissions, including healthcare projects. During that time I have undertaken design audits and/or detailed technical appraisals of both new and existing mechanical and electrical engineering services installations, prepared expert witness reports and provided advice to clients and their legal representatives in respect of duties...
Mr Corrigan in LONDON
Hugh has over 35 years’ experience in civil, structural and multidisciplinary design, engineering and management of major infrastructure and building projects, including design-build, EPC, PFI and BOT projects. He has been responsible for the design and management of many unique building and infrastructure projects, including complex above and below ground structures in difficult ground conditions. Hugh has extensive expertise in civil, structural, geotechnical, transportation, utility, water, wastewater...
Mr Duckham in MANCHESTER
David is part of the architects' practice Purcell, who have offices around the UK, thus providing a local presence. His direct email is given above. • Practised since 1973 • Special expertise with historic buildings • How architects work and the standards expected of them • How buildings are procured, designed and constructed • How contractors work and the standards expected of them • Investigating defects, identifying causes and responsibility • Building contracts, standard forms, use and interpretation
Mr Sharp in SHEFFIELD
Quantity surveying • Quantum • Construction contracts • Quantification and valuation of work carried out • Quantification of damages, loss and/or expenses incurred • Liability in professional negligence matters • Liability in professional indemnity matters • Programming issues (e.g. delay, extension of time, acceleration and disruption) • Due diligence forensic examination of companies and projects
Mr Mathieson in POOLE
Building contract disputes • Disrepair claims • Defective design & workmanship negligence claims • Building pathology • Building conversion & restoration • Party Wall, etc., Act Mr Mathieson is a Member of the Royal Institution of Chartered Surveyors, Managing Director of Ellis Belk Associates Limited and a practising Chartered Building Surveyor with many years' experience investigating building defects of both design and workmanship. In addition to his expert witness workload, Mr Mathieson has been involved with Channel...
Eur Ing Lumley in LONDON
Technical: • Petroleum products, including treatment design & development • Energy conservation & management • Environment • Oil & gas processing • Pipelines • Metal cutting • Metal forming • Mineral oil extraction • Gas supply & control • Pharmaceutical products • Process plant • Pressure vessels • Food & drink processing machinery • Chemical industry machinery • Welding • Functional: • Consultancy services • Process engineering & contracting • Quality control • Assurance & inspection ISO 9001/2 • Project management • Purchasing & procurement • Contracting •...
Mr Correa in ESHER
• Forensic engineering and expert witness services • Delay and quantum analysis • Construction disputes • Complex insurance claims
Mr Kelly in BALLYNAHINCH
My fields of expertise are quantum, dispute management and adjudication. I am also trained as an Arbitrator, Adjudicator, Conciliator and Mediator in disputes for construction, property, commercial agreements, infrastructure, oil and gas, commodities, etc.
Dr Al Jarratt in HITCHIN
Mediator • Practising Certified Intl Commercial Mediator • ICE's Mediator/Conciliator • CIArb's Mediator • CIArb's CDP Mediator • CIArb's Personal Injury Mediator • CIArb's LB of Tower Hamlets Mediator • RICS' Mediator • CMC's Mediator • CIC's Mediator • TAE's QDR • TAE BMF's Mediator • TBG Mediator • ICC's Mediator • IMI's Mediator • IMI's Mentor • FIMC's Mediator • WIPO's Mediator • IOM's Mediator • BIMC's Mediator • AMATI • Mayor's & City of London Court's Mediator Arbitrator & Adjudicator • Practising Intl Arbitrator across...
Mr Flowers in BETHERSDEN
I am a Chartered Building Surveyor with over 45 years' experience in all aspects of building surveying and defect diagnosis, with particular experience in residential buildings. I am still actively involved in surveying and contract administration, and recent expert experience has related to housing disrepair, defective building works and criminal cases.
Ms Williams in CHORLEY
Construction defects: investigations & reports into defective work with respect to new & refurbished buildings • Professional negligence: investigations & reports into professional negligence of architects & surveyors • Contract matters: investigations & reports into contract & sub-contract disputes
Mr Brasnett in YORK
Building pathology • Construction defects and costs • Boundary disputes • Professional negligence • Building surveying
Mr Hearne in NEATH
Quantum • Construction, civil engineering, railway, highway, infrastructure, building & refurbishment • Loss of profit in construction contracts • Breach of construction contracts • Extension of time analysis • Loss and expense claims • Flood damage • Fire/smoke damage • Storm damage • Professional fees Construction/quantity surveying costs Control • Planning • Forecasting • Estimating • Interim valuations • Delay cost calculations • Cashflow • Valuation of sums withheld Construction contracts Subcontracts • Procurement, selection...
Mr Rudd in KINGSTON UPON THAMES
Kevin Rudd is a Fellow of the Institute of Mechanical Engineers in the UK & is the only member in the British Cement Industry who has achieved this status • With ~20 years' experience, including: • Expert witness • Due diligence • Cement plant feasibility studies • Green or brown field cement plant project management • Technical & financial evaluation of equipment • Factory acceptance testing • Cement plant operations • Cement industry insurance claim investigations • Troubleshooting for cement kilns & mills
Mr Faithorn in ORPINGTON
Building, construction problems: • Construction negligence • Professional negligence (architecture & construction) • Home improvement disputes • Contractual disputes (construction) • Contractors, subcontractors disputes • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming, time disputes (construction) • Property insurance, claims investigation • Risk assessment (property insurance) • Claims investigation (property insurance) • Personal injury (property insurance) •...
Mr Belk in SIDCUP
Disrepair • Construction defects • Design and specification • Construction procurement and tendering • Programme management • Contract administration • Housing • Educational buildings
Mr Barrows in ST HELIER
Expert witness and troubleshooting of the following electrical building services: • Extra low voltage • Safety extra low voltage • Low voltage • Standby generation • Uninterruptible power supplies • Critical and essential electrical systems • Earthing • Lightning protection • Interior lighting • Exterior lighting • Emergency lighting • Fire alarm systems • Due diligence surveys and investigation • Mediation • Scott schedules • Contractual disputes • Testing and commissioning procedures • Dilapidation surveys • Forensic investigations • Electrical...
Mr Klein in WARRINGTON
Building & construction problems • Negligence (construction) • Professional negligence (architecture/construction) • Home improvement disputes • Contractual disputes (construction) • Contractor & subcontractor disputes • Improper contract administration (construction) • Cost disputes (construction) • Professional fees claims • Programming & time disputes (construction) • Property insurance & claims investigation • Claims investigation (property insurance) • Public liability insurance (construction) • Contractor insurance • Professional...
Dr Crawley in BANSTEAD
Valuing of: • Pecuniary damages associated with employer delays resulting in extension of time to completion in respect of construction contracts • Pecuniary damages associated with disruption claims as a result of breach by the employer • Additional or extra work due to changes in design disputed by the parties • Monetary costs in respect of insurance claims • Pecuniary damages associated with incomplete work or poor work executed by contractors