Miss Stylianide in LONDON
Technical specifications • Construction/architecture-related matters • Building information modelling (BIM) • Contract administration/risk and liabilities/interpretation of contract terms and obligations • Defects in construction materials or workmanship • Compliance with building codes and regulations • Breach of contract and professional negligence • Standard of care in construction • Design deficiencies • Project delays
Mr Jackson in LEEDS
I am a Chartered Quantity Surveyor with significant experience in the construction and engineering industry. My expertise covers professional negligence, contractual disputes, contract administration issues and costs disputes. I am the holder of an expert witness training certificate issued by the Royal Institution of Chartered Surveyors (RICS).
Mr Corrigan in LONDON
Hugh has over 35 years’ experience in civil, structural and multidisciplinary design, engineering and management of major infrastructure and building projects, including design-build, EPC, PFI and BOT projects. He has been responsible for the design and management of many unique building and infrastructure projects, including complex above and below ground structures in difficult ground conditions. Hugh has extensive expertise in civil, structural, geotechnical, transportation, utility, water, wastewater design and marine engineering. He has extensive experience in forensic engineering...
Mr Daunt in NEWCASTLE UPON TYNE
I am a Chartered Quantity Surveyor with 30 years' construction experience in commercial, education, healthcare, justice, industrial, mixed-use, retail, infrastructure and residential buildings. I have significant hands-on experience in numerous forms of contract, including JCT, NEC, PFI, IChemE and bespoke main and subcontract forms. Acted as Expert Advisor in a £150M High Court proceedings brought under the Building Safety Act 2022 in a high-rise mixed residential development in London (HT-2020-000467 and HT-2022-000024). Testified expert in the High Court on a £1.2M dispute on t...
Mr Hearne in NEATH
Quantum • Construction, civil engineering, railway, highway, infrastructure, building & refurbishment • Loss of profit in construction contracts • Breach of construction contracts • Extension of time analysis • Loss and expense claims • Flood damage • Fire/smoke damage • Storm damage • Professional fees Construction/quantity surveying costs Control • Planning • Forecasting • Estimating • Interim valuations • Delay cost calcula...
Mr Kelly in BALLYNAHINCH
My fields of expertise are quantum, dispute management and adjudication. I am also trained as an Arbitrator, Adjudicator, Conciliator and Mediator in disputes for construction, property, commercial agreements, infrastructure, oil and gas, commodities, etc.
Mr Sharp in SHEFFIELD
Quantity surveying • Quantum • Construction contracts • Quantification and valuation of work carried out • Quantification of damages, loss and/or expenses incurred • Liability in professional negligence matters • Liability in professional indemnity matters • Programming issues (e.g. delay, extension of time, acceleration and disruption) • Due diligence forensic examination of companies and projects
Mr Clark in LEEDS
Academy of Experts & Registered Expert Witness Consulting Engineer with more than 50 years' experience in the UK, Middle East, Far East and SE Asia. Design of numerous low- and high-rise commercial, industrial and public buildings and structures, as well as basements, foundations and retaining walls involving: • masonry • concrete • steel • timber. Investigation of defective: • design • materials • construction • fabrication • manufacturing. Investigation of: ...
Mr Holden-Smith in CLITHEROE
Chartered Quantity Surveyor | Chartered Construction Manager | Forensic Delay Analyst | Registered Adjudicator | Registered Arbitrator Forensic delay analysis in construction • Quantum of construction claims including, but not limited to, commercial construction works, loss and expense claims and damages
Mr Murphy in READING
Forensic delay and time element analysis with over 34 years' experience across conventional and renewable energy, data centres, infrastructure and industrial construction • Critical path and programme evaluation, extension of time assessment, delay in start-up and business interruption claims, reinstatement scheduling, and insurer advisory services • Extensive EPC experience under FIDIC, NEC and JCT contracts • Holds international appointments across the UK, Europe, MENA, the US and Asia
Mr Correa in LONDON
• Forensic engineering and expert witness services • Delay and quantum analysis • Construction disputes • Complex insurance claims
Mr Klinefelter in DISS
Construction/civil engineering - delays, including the following disciplines: • Highways • Structures • Marine • Building • M&E • Facades • Infrastructure • Airports • Rail • Civil engineering • Construction • High-end residential
Mr Gallucci in LONDON
Quantity surveying matters • Building surveying matters • Delay matters • Specialising in mechanical and electrical services
Mr Knott in LONDON
Summary of Matters in which I am competent to accept instructions (Quantum and Quantum Expert Work) I am a Chartered Quantity Surveyor (MRICS) and Member of the Chartered Institute of Arbitrators (MCIArb) with approximately 20 years’ experience in the construction industry . My professional practice focuses on the commercial and financial management of construction projects and the preparation of quantum analyses, quantum reports and independent expert quantum evidence in construction and engineering disputes. I special...